{"product_id":"jab-6kw-14-immersion-heater-1-3-4-bsp-duc-2-cylinder-spare","title":"JAB 6kW 14\" Immersion Heater 1 3\/4\" BSP | DUC 2 Cylinder Spare","description":"\u003c!-- SEO Product Name: JAB 6kW 14\" Immersion Heater 1 3\/4\" BSP | DUC 2 Cylinder Spare --\u003e\n\u003cdiv style=\"font-size: 16px; max-width: 900px; line-height: 1.6; color: #222;\"\u003e\n\u003cp style=\"margin: 0 0 14px 0;\"\u003eThe \u003cstrong\u003eJAB 6kW 14\" replacement immersion heater\u003c\/strong\u003e is a \u003cstrong\u003esingle-element, 1¾\" BSP\u003c\/strong\u003e heater for \u003cstrong\u003eJAB DUC 2 unvented hot water cylinders\u003c\/strong\u003e. It is a straightforward \u003cstrong\u003elike-for-like swap\u003c\/strong\u003e: drain down, unscrew the old element with a standard immersion spanner, fit the new one and reconnect. It suits a \u003cstrong\u003edirect or indirect back-up heater position\u003c\/strong\u003e and keeps the hot water running when an original element has failed or scaled up.\u003c\/p\u003e\n\u003cp style=\"margin: 0 0 18px 0;\"\u003eAt \u003cstrong\u003e6kW\u003c\/strong\u003e it delivers double the output of a standard 3kW element, so it recovers the cylinder faster on a \u003cstrong\u003ededicated, correctly rated electrical supply\u003c\/strong\u003e. Because the electrical load is high, the supply, cable and isolation must be sized for it, and the connection should be made by a \u003cstrong\u003ecompetent person in line with BS 7671 and Part P\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cdiv style=\"display: flex; flex-wrap: wrap; gap: 10px; margin: 0 0 20px 0;\"\u003e\n\u003cdiv style=\"flex: 1 1 130px; background: #008377CF; color: #ffffff; border-radius: 8px; padding: 14px 10px; text-align: center;\"\u003e\n\u003cdiv style=\"font-size: 24px; font-weight: bold;\"\u003e6kW\u003c\/div\u003e\n\u003cdiv style=\"font-size: 13px;\"\u003eRated output\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 130px; background: #008377CF; color: #ffffff; border-radius: 8px; padding: 14px 10px; text-align: center;\"\u003e\n\u003cdiv style=\"font-size: 24px; font-weight: bold;\"\u003e14\"\u003c\/div\u003e\n\u003cdiv style=\"font-size: 13px;\"\u003eElement length\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 130px; background: #008377CF; color: #ffffff; border-radius: 8px; padding: 14px 10px; text-align: center;\"\u003e\n\u003cdiv style=\"font-size: 24px; font-weight: bold;\"\u003e1¾\" BSP\u003c\/div\u003e\n\u003cdiv style=\"font-size: 13px;\"\u003eThread size\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 130px; background: #008377CF; color: #ffffff; border-radius: 8px; padding: 14px 10px; text-align: center;\"\u003e\n\u003cdiv style=\"font-size: 24px; font-weight: bold;\"\u003e1\u003c\/div\u003e\n\u003cdiv style=\"font-size: 13px;\"\u003eSingle element\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 130px; background: #008377CF; color: #ffffff; border-radius: 8px; padding: 14px 10px; text-align: center;\"\u003e\n\u003cdiv style=\"font-size: 24px; font-weight: bold;\"\u003eDUC 2\u003c\/div\u003e\n\u003cdiv style=\"font-size: 13px;\"\u003eJAB cylinders\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 130px; background: #008377CF; color: #ffffff; border-radius: 8px; padding: 14px 10px; text-align: center;\"\u003e\n\u003cdiv style=\"font-size: 24px; font-weight: bold;\"\u003eDIY swap\u003c\/div\u003e\n\u003cdiv style=\"font-size: 13px;\"\u003eSpanner fit\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"border-left: 5px solid #c62828; background: #fdecea; padding: 12px 14px; margin: 0 0 12px 0; border-radius: 4px;\"\u003e\n\u003cstrong\u003eSafety:\u003c\/strong\u003e isolate the electrical supply at the double-pole isolator and drain the cylinder before removing the old element. \u003cstrong\u003eNever switch an immersion heater on until the cylinder is full of water\u003c\/strong\u003e, and make sure the element is fully submerged at all times. A 6kW load draws roughly 25A on a 240V single-phase supply, so the circuit, cable and isolator must be rated accordingly and \u003cstrong\u003ethe electrical connection must be made by a competent person\u003c\/strong\u003e.\u003c\/div\u003e\n\u003cdiv style=\"border-left: 5px solid #f9a825; background: #fff8e1; padding: 12px 14px; margin: 0 0 12px 0; border-radius: 4px;\"\u003e\n\u003cstrong\u003eCompatibility:\u003c\/strong\u003e the JAB DUC 2 Horizontal uses \u003cstrong\u003e3kW immersions\u003c\/strong\u003e as the standard fitment on every size from 125L to 300L. Before fitting a 6kW element, confirm with JAB that it is approved for your cylinder model, and check your supply can carry the extra load. Always match the \u003cstrong\u003e14\" length and 1¾\" BSP thread\u003c\/strong\u003e to the existing boss.\u003c\/div\u003e\n\u003cdiv style=\"border-left: 5px solid #008377CF; background: #e6f4f2; padding: 12px 14px; margin: 0 0 22px 0; border-radius: 4px;\"\u003e\n\u003cstrong\u003eGood to know:\u003c\/strong\u003e replacing the element does not disturb the unvented safety kit, but the work is on a sealed pressurised system, so any other work on the cylinder must be carried out by a \u003cstrong\u003eG3-qualified installer\u003c\/strong\u003e.\u003c\/div\u003e\n\u003ch3 style=\"color: #008377cf; margin: 0 0 12px 0; font-size: 20px;\"\u003eKey features\u003c\/h3\u003e\n\u003cdiv style=\"display: flex; flex-wrap: wrap; gap: 12px; margin: 0 0 24px 0;\"\u003e\n\u003cdiv style=\"flex: 1 1 260px; border: 1px solid #008377CF; border-radius: 8px; padding: 14px;\"\u003e\n\u003cdiv style=\"color: #008377cf; font-weight: bold; margin-bottom: 4px;\"\u003e6kW high output\u003c\/div\u003e\nDouble the heat input of a standard 3kW element for \u003cstrong\u003efaster recovery\u003c\/strong\u003e and quicker reheats.\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 260px; border: 1px solid #008377CF; border-radius: 8px; padding: 14px;\"\u003e\n\u003cdiv style=\"color: #008377cf; font-weight: bold; margin-bottom: 4px;\"\u003e1¾\" BSP thread\u003c\/div\u003e\nThe \u003cstrong\u003estandard sealed-system boss size\u003c\/strong\u003e used on JAB DUC 2 cylinders, not the larger 2¼\" domestic boss.\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 260px; border: 1px solid #008377CF; border-radius: 8px; padding: 14px;\"\u003e\n\u003cdiv style=\"color: #008377cf; font-weight: bold; margin-bottom: 4px;\"\u003e14\" element\u003c\/div\u003e\nThe correct \u003cstrong\u003eimmersed length\u003c\/strong\u003e to match the original heater position in the cylinder.\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 260px; border: 1px solid #008377CF; border-radius: 8px; padding: 14px;\"\u003e\n\u003cdiv style=\"color: #008377cf; font-weight: bold; margin-bottom: 4px;\"\u003eUser-swappable\u003c\/div\u003e\nUnscrews with a \u003cstrong\u003estandard immersion spanner\u003c\/strong\u003e, with no special tools and no need to move the cylinder.\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 260px; border: 1px solid #008377CF; border-radius: 8px; padding: 14px;\"\u003e\n\u003cdiv style=\"color: #008377cf; font-weight: bold; margin-bottom: 4px;\"\u003eJAB DUC 2 spare\u003c\/div\u003e\nA \u003cstrong\u003edirect replacement\u003c\/strong\u003e for failed or scaled elements on JAB DUC 2 unvented cylinders.\u003c\/div\u003e\n\u003cdiv style=\"flex: 1 1 260px; border: 1px solid #008377CF; border-radius: 8px; padding: 14px;\"\u003e\n\u003cdiv style=\"color: #008377cf; font-weight: bold; margin-bottom: 4px;\"\u003eStandalone or back-up\u003c\/div\u003e\nHeats the cylinder on its own, or provides \u003cstrong\u003eboiler or heat pump back-up\u003c\/strong\u003e on indirect models.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003ch3 style=\"color: #008377cf; margin: 0 0 12px 0; font-size: 20px;\"\u003eSpecification\u003c\/h3\u003e\n\u003cdiv style=\"margin: 0 0 24px 0; border: 1px solid #cfd8d6; border-radius: 8px; overflow: hidden;\"\u003e\n\u003cdiv style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px;\"\u003eHeater\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px; background: #f4faf9;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eBrand\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003eJAB\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003ePower rating\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003e6kW\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px; background: #f4faf9;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eElement length\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003e14 inch\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eThread size\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003e1¾ inch BSP\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px; background: #f4faf9;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eNumber of elements\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003e1\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px;\"\u003eApplication\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px; background: #f4faf9;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eSuitable for\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003eJAB DUC 2 unvented hot water cylinders (confirm the model with JAB before fitting)\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eUse\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003eReplacement for a failed or scaled element, standalone or back-up heating\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px; background: #f4faf9;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eTool needed\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003eStandard immersion spanner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px;\"\u003eStandards\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px; background: #f4faf9;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eElectrical\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003eWiring to BS 7671 and Part P\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv style=\"display: flex; padding: 10px 14px;\"\u003e\n\u003cdiv style=\"flex: 1;\"\u003e\u003cstrong\u003eUnvented work\u003c\/strong\u003e\u003c\/div\u003e\n\u003cdiv style=\"flex: 2;\"\u003eG3 (Building Regulations Part G3) for any work beyond the element swap\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003ch3 style=\"color: #008377cf; margin: 0 0 12px 0; font-size: 20px;\"\u003eFrequently asked questions\u003c\/h3\u003e\n\u003cdetails style=\"margin: 0 0 10px 0; border: 1px solid #008377CF; border-radius: 6px; overflow: hidden;\"\u003e\n\u003csummary style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px; cursor: pointer;\"\u003eCan I replace the immersion heater myself?\u003c\/summary\u003e\n\u003cdiv style=\"padding: 12px 14px;\"\u003eMechanically, yes. It is a \u003cstrong\u003espanner-fit like-for-like swap\u003c\/strong\u003e: isolate the power, drain the cylinder, unscrew the old element and fit the new one with a good seal. The \u003cstrong\u003eelectrical connection\u003c\/strong\u003e should be made or checked by a competent person, particularly at 6kW.\u003c\/div\u003e\n\u003c\/details\u003e\n\u003cdetails style=\"margin: 0 0 10px 0; border: 1px solid #008377CF; border-radius: 6px; overflow: hidden;\"\u003e\n\u003csummary style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px; cursor: pointer;\"\u003eWhat size and thread does it need?\u003c\/summary\u003e\n\u003cdiv style=\"padding: 12px 14px;\"\u003eThis heater is \u003cstrong\u003e14 inches long with a 1¾ inch BSP thread\u003c\/strong\u003e. Check the boss on your cylinder before ordering. The common domestic 2¼ inch boss is a different size.\u003c\/div\u003e\n\u003c\/details\u003e\n\u003cdetails style=\"margin: 0 0 10px 0; border: 1px solid #008377CF; border-radius: 6px; overflow: hidden;\"\u003e\n\u003csummary style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px; cursor: pointer;\"\u003eWill my supply handle 6kW?\u003c\/summary\u003e\n\u003cdiv style=\"padding: 12px 14px;\"\u003eA 6kW load draws roughly \u003cstrong\u003e25A on a 240V single-phase supply\u003c\/strong\u003e. It needs its own correctly rated circuit, cable and \u003cstrong\u003edouble-pole isolator\u003c\/strong\u003e. If you are unsure, have an electrician check the circuit before fitting.\u003c\/div\u003e\n\u003c\/details\u003e\n\u003cdetails style=\"margin: 0 0 10px 0; border: 1px solid #008377CF; border-radius: 6px; overflow: hidden;\"\u003e\n\u003csummary style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px; cursor: pointer;\"\u003eIs a 6kW element approved for my JAB cylinder?\u003c\/summary\u003e\n\u003cdiv style=\"padding: 12px 14px;\"\u003eJAB lists \u003cstrong\u003e3kW immersions\u003c\/strong\u003e as standard on the DUC 2 Horizontal range. Confirm with JAB that a 6kW element is approved for your exact cylinder model and size before fitting.\u003c\/div\u003e\n\u003c\/details\u003e\n\u003cdetails style=\"margin: 0 0 10px 0; border: 1px solid #008377CF; border-radius: 6px; overflow: hidden;\"\u003e\n\u003csummary style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px; cursor: pointer;\"\u003eDo I need to drain the cylinder first?\u003c\/summary\u003e\n\u003cdiv style=\"padding: 12px 14px;\"\u003eYes. \u003cstrong\u003eIsolate the electrics, shut off the cold supply and drain the cylinder\u003c\/strong\u003e below the heater position. Refill completely before switching the heater back on, as an element must never run dry.\u003c\/div\u003e\n\u003c\/details\u003e\n\u003cdetails style=\"margin: 0 0 10px 0; border: 1px solid #008377CF; border-radius: 6px; overflow: hidden;\"\u003e\n\u003csummary style=\"background: #008377CF; color: #ffffff; font-weight: bold; padding: 10px 14px; cursor: pointer;\"\u003eDo I need a G3-qualified installer?\u003c\/summary\u003e\n\u003cdiv style=\"padding: 12px 14px;\"\u003eNot for the element swap alone, but any work on the \u003cstrong\u003eunvented safety devices\u003c\/strong\u003e or pressurised system must be carried out and notified by a \u003cstrong\u003eG3-qualified installer\u003c\/strong\u003e.\u003c\/div\u003e\n\u003c\/details\u003e\n\u003c\/div\u003e","brand":"JAB","offers":[{"title":"Default Title","offer_id":68483294822790,"sku":"JAB-6kW-14-imm","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0958\/2051\/3629\/files\/14IncoloyImmersionHeater134IncoloyPocketforUnventedCylinders.webp?v=1787293264","url":"https:\/\/qualityheating.co.uk\/products\/jab-6kw-14-immersion-heater-1-3-4-bsp-duc-2-cylinder-spare","provider":"AIZO Quality Heating","version":"1.0","type":"link"}